Home: Project stages > Analysis
The current situation is described in terms of efficiency, impact and the strengths and weaknesses in the current logistics.
Future needs are consolidated with the current to form the design basis. This is done through the following activities:
The outcome of this phase is summarized in a report that comprehensively and clearly describes the current situation and future needs and determines the design basis of the solution.
15-08-2011
Danfoss Solar Inverters, whose UniLynx and TripleLynx inverters are used in private as well as commercial solar energy systems, for the transformation of solar energy to electric power, has experienced a pronounced increase in the demand for their products; a situation which has pressed the production in Gråsten and Sønderborg to the utmost.
10-02-2011
Norway’s largest manufacturer of dairy products is building a new, modern production site at Jæren near Stavanger. The internal logistics, which is an essential element in achieving the objectives, has been designed in collaboration with Langebæk Logistik.
16-12-2010
A new type of plastic pallet seems to be able to generate considerable savings in the distribution.
Langebæk Logistik A/S Gydevang 24 DK-3450 Allerød CVR 16583847 Telephone +45 44 95 55 55 info@langebaek.com